Concrete arithmetic · volume, bags and cost

Concrete Calculator: Yards, Bags and Volume

Enter the shape you are pouring — a slab, a footing, a wall or a column — and the calculator returns the volume in cubic feet, cubic yards and cubic metres, the bags of mix at every common bag size, and the ready-mix yards a supplier would bill. Add several pours to one list and it sums them, with the waste allowance applied once.

Cubic yards, feet and metres Bags at 40 / 50 / 60 / 80 / 90 lb Multiple pours in one list No login

Calculator

Units and allowance

The waste allowance is added to the volume before the bags and yards are worked out.

Pours to add up

Each row is one pour. The totals below sum every row, then apply the waste allowance once. A column row reads length as diameter and width as height.

2.72 yd³ 73.33 ft³ or 2.0766 m³. Includes 10% waste.
Cubic feet
73.33 ft³
Cubic yards
2.72 yd³
Cubic metres
2.0766 m³
With waste
80.67 ft³
Each pour in the list, before the waste allowance.
PourVolumeYards
Patio slab33.33 ft³1.23 yd³
Footing40 ft³1.48 yd³
Bags needed for the volume with the waste allowance already applied.
BagYieldsBags
40 lb bag 0.3 ft³ 245
50 lb bag 0.375 ft³ 196
60 lb bag 0.45 ft³ 163
80 lb bag 0.6 ft³ 123
90 lb bag 0.675 ft³ 109
2 pour(s) added up Volume 2.72 yd³. 10 ft 4 in 10 ft
2 pour(s) added up — 2.72 yd³.

Three pours, measured

Every figure below is produced by the same engine that runs in the browser, at build time — so an example cannot drift from the calculator above.

A 10 ft x 10 ft patio, 4 in thick

2.72 yd³

73.33 ft³ or 2.0766 m³. Includes 10% waste.

The first row: 10 x 10 x 4/12 is 33.3333 ft³, which is 1.2346 yd³. That is 56 bags of 80 lb mix, or 112 of the 40 lb size.

A 24 ft driveway, 12 ft wide, 5 in thick

4.44 yd³

120 ft³ or 3.398 m³. Includes 10% waste.

A driveway is a bigger rectangle: 24 x 12 x 5/12 is 120 ft³, or 4.4444 yd³. With the default 10 percent waste that is about 4.89 yd³, so a supplier would bill 5 yd³.

A wall and its footing together

14.07 yd³

380 ft³ or 10.7604 m³. Includes 10% waste.

Two rows accumulate: a 30 ft wall 3 ft high and 8 in thick is 60 ft³, and a 30 ft footing 16 in wide and 8 in deep is 26.6667 ft³, for 86.6667 ft³ in total.

What a concrete calculator actually has to add up

Concrete is ordered and priced by volume, but it is poured by dimension, and the two do not meet until something multiplies them together. A patio is a length and a width and a thickness; a footing is a trench; a column is a circle; a wall is a plane with a depth. Every one of them reduces to a volume, and every volume divides by 27 to become the cubic yard a ready-mix truck is billed in.

This calculator does that reduction shape by shape and then keeps going. It converts the volume into cubic feet, cubic yards and cubic metres, so a metric order and an imperial drawing can be compared on one screen. It divides the same volume by the yield of each common bag of mix to give the bag count, because a small pour is bought in bags and a large one in yards. And it holds several pours in one list, because a real job is rarely a single rectangle.

The list is the part a single-shape calculator cannot do. A slab plus a footing plus four piers is one order of concrete, not four, and the waste allowance and the delivery fee apply to the total. Adding the rows as you go, and reading one total at the bottom, is the arithmetic a pour day actually needs.

Cubic feet, cubic yards and the 27 that connects them

The one conversion worth memorising is that a cubic yard is 27 cubic feet, because a yard is three feet in each of three directions and three cubed is 27. Everything else follows. A slab 10 ft by 10 ft and 4 in thick is 10 x 10 x (4/12) = 33.3333 cubic feet, and 33.3333 divided by 27 is 1.2346 cubic yards. The number a supplier asks for is the second one.

Working in cubic feet first is what keeps the arithmetic honest, because the dimensions are usually a mix of feet and inches. A thickness is almost always quoted in inches even when the plan is in feet, and a footing depth likewise. Converting every length to feet before multiplying means the volume never carries a hidden unit, and the conversion to yards happens once at the end rather than inside each dimension.

Metric is a single step further. One cubic metre is 1.30795 cubic yards, so a volume in yards divides by that to become cubic metres. The site prints all three so a pour can be checked against a metric delivery ticket and an imperial drawing without a second calculation.

How many bags a yard of concrete becomes

A bag of concrete mix is sold by weight, and each weight yields a different volume of finished concrete. An 80 lb bag of Quikrete Concrete Mix yields about 0.60 cubic feet, a 60 lb bag about 0.45, a 50 lb bag about 0.375 and a 40 lb bag about 0.30, all quoted from the manufacturer data sheet. Dividing the volume by the yield and rounding up gives the bag count.

The round-up matters more than it looks. Bags cannot be bought in fractions, and a pour that is half a bag short is a cold joint, so the count is always the next whole bag. The calculator also applies the waste allowance before it divides, so the bags it reports already include the margin the pour will lose to an uneven subgrade or a spill.

The bag count is the honest way to price a small pour and a sanity check on a large one. A cubic yard of concrete is 27 cubic feet, which is 45 bags of 80 lb mix, and a ready-mix truck carries several yards. That is why bags win below roughly a yard and lose above it, and the cost page works the crossover out from the prices you enter.

Why the waste allowance is not padding

A volume calculated from a drawing is the volume of the hole, not the volume of concrete that ends up in it. Ground is never perfectly level, a form is never perfectly true, and a wheelbarrow always keeps a little on its side. The waste allowance is the margin added on top of the calculated volume to cover that gap, and 5 to 10 percent is the usual range for a flat pour.

The allowance is a percentage of the volume, so it scales with the job rather than sitting at a flat number of bags. A 1 cubic yard pour with a 10 percent allowance orders 1.1 yards, while a 10 yard pour orders 11. The larger the pour, the more absolute concrete the same percentage represents, which is why a big job can often use a smaller allowance than a fussy small one.

This calculator applies the waste percentage once, to the summed volume, and shows the allowance as a separate figure so it can be judged rather than buried. Turn it to zero to see the bare geometric volume, or raise it for a pour over rough ground. It is an input, not a hidden fudge factor.

Questions this page answers

How do I calculate concrete in cubic yards?

Multiply length by width by thickness, all in feet, to get cubic feet, then divide by 27 to get cubic yards. A 10 ft by 10 ft slab 4 in thick is 10 x 10 x 0.3333 = 33.3333 cubic feet, which is 1.2346 cubic yards.

How many bags of concrete are in a cubic yard?

A cubic yard is 27 cubic feet. At about 0.60 cubic feet per 80 lb bag, that is 45 bags to the yard. The same yard is 60 bags of 60 lb mix, 72 of 50 lb, or 90 of the 40 lb size, because each weight yields a different volume.

How much extra concrete should I order?

Add 5 to 10 percent for a flat pour over a prepared subgrade, and more for rough ground or a complicated form. The calculator applies the waste percentage you set to the total volume and shows it as its own figure, so the allowance is visible rather than buried in the bag count.

Can I mix feet and inches in the same calculation?

Yes. A plan is usually in feet and a thickness in inches, so the calculator converts every length to feet before multiplying. Enter 10 ft by 10 ft with a 4 in thickness and the volume comes out in cubic feet, then in cubic yards and cubic metres.

What is the difference between a slab, a footing and a wall here?

They are all rectangles and they share one formula; the difference is which dimension is the thickness. A slab is length by width by thickness, a footing is the same with depth, and a wall is length by height by thickness. The column is the one shape with a round section, and it uses pi r squared h instead.

Estimating tool only. It applies the arithmetic you give it and nothing else: no local code, no structural design, no subgrade survey, no supplier quote and no reinforcement schedule. The bag yields, mortar coverage and mix ratio are quoted from the sources listed below; every price, core volume and bag volume is an editable assumption. Confirm any order against your own measurements and your supplier. Nothing you type is uploaded.

Put this calculator on your site

Embed this calculator

Copy the snippet into any page. The widget is free, needs no key and sends nothing until a visitor interacts with it.

Open widget view