Concrete arithmetic · volume, bags and cost

Concrete Step Calculator: Stair and Landing Volume

A solid flight of concrete steps is a stack of boxes, each one taller than the last. Enter the number of steps, the riser height, the tread depth and the width, and the calculator sums the flight and any landing into one volume.

Solid flight volumeRiser and treadOptional landingNo login

Calculator

Steps and landing

Each step is a box one riser taller than the last. The landing sits on top at the full flight height.

0.52 yd³ 12.83 ft³ geometric, or 0.3634 m³. Includes 10% waste, so order 14.12 ft³ = 0.52 yd³.
Flight volume
12.83 ft³
Landing volume
0 ft³
Total
12.83 ft³ = 0.48 yd³
Bags
24 at 80 lb
Bags needed for the volume with the waste allowance already applied.
BagYieldsBags
40 lb bag 0.3 ft³ 48
50 lb bag 0.375 ft³ 38
60 lb bag 0.45 ft³ 32
80 lb bag 0.6 ft³ 24
90 lb bag 0.675 ft³ 21
3 solid steps Volume 0.48 yd³. 11 in tread 7 in rise 4 ft wide
3 solid steps — 0.48 yd³.

Three flights, summed

Every figure below is produced by the same engine that runs in the browser, at build time — so an example cannot drift from the calculator above.

Three steps, 7 in risers, 4 ft wide

0.52 yd³

12.83 ft³ geometric, or 0.3634 m³. Includes 10% waste, so order 14.12 ft³ = 0.52 yd³.

The preset: 4 x (11/12) x (7/12) x (1+2+3) = 12.8333 ft³, which is 0.4753 yd³ and 22 bags of 80 lb mix.

A porch flight with a landing

1.66 yd³

40.83 ft³ geometric, or 1.1563 m³. Includes 10% waste, so order 44.92 ft³ = 1.66 yd³.

A landing on top adds its own slab: 4 ft deep, 4 ft wide and as tall as the whole flight, so 4 x 4 x (3 x 7/12) = 28 ft³ on top of the steps.

A tall flight of six steps

1.83 yd³

44.92 ft³ geometric, or 1.2719 m³. Includes 10% waste, so order 49.41 ft³ = 1.83 yd³.

Six steps is 4 x (11/12) x (7/12) x (1+2+3+4+5+6) = 89.8333 ft³, which is 3.3272 yd³ and large enough to think about a ready-mix order rather than bags.

A solid stair is a stack of boxes

A concrete stair that is poured solid rather than built over a void is a set of rectangular boxes stacked against one another. The bottom step is one riser high, the next is two, the next three, and so on to the top. Each box is the width of the stair, the depth of one tread, and its own height, and the flight is their sum.

That sum has a closed form, which is why the calculator is quick. The heights are 1, 2, 3 up to the number of steps, and the sum of the first n whole numbers is n times n plus one over two. Multiplying by the width, the tread depth and one riser gives the whole flight without adding box by box, and the number matches a box-by-box addition exactly.

Reading the result as a single volume is the point. A stair is bought as one pour, so its concrete is ordered as one figure, and the waste allowance applies to the flight as a whole rather than to each step. The calculator sums the steps first and applies the allowance once.

Risers, treads and the numbers that make a stair

A stair is defined by its rise and its run. The riser is the height of one step, the tread or run is the depth of one step, and the two together set how steep the stair feels. Common residential proportions sit near a 7 inch riser and an 11 inch tread, which is close to the comfortable rule that two risers plus one tread is about 25 inches.

The total rise of a flight is the riser height times the number of steps, and that total is usually set by the height it has to climb rather than chosen freely. The number of steps then follows by dividing the total rise by a comfortable riser. The calculator takes the number of steps and the riser directly, so a design that fixes the total rise can be turned into steps before the volume is worked out.

The code range for risers and treads varies by jurisdiction and by occupancy, and this page does not state one. What it does is take whatever riser and tread you enter and measure the concrete, so the volume can be found once the geometry is settled rather than before.

The landing is its own pour

A porch or a door at the top of a flight almost always has a landing, and a landing is a slab of its own sitting on top of the highest step. Its volume is its depth times its width times the height it stands at, which is the whole flight height. That is why a landing can be a large fraction of the concrete even though it looks like a flat pad.

The calculator adds the landing as a separate figure, using the landing depth and the flight height, so it can be seen on its own. A landing that is four feet square and three risers high carries as much concrete as several of the steps, and leaving it out of the order is a common way to run short.

Where the landing is wider than the stair, or the stair turns, the shape stops being a single stack and is best split into pieces, each measured and summed. The flight formula covers the straight run; the landing field covers a rectangular landing on top of it.

Questions this page answers

How do I calculate concrete for steps?

Treat each step as a box that is the stair width by one tread deep by its own height, and add the boxes. The heights are 1, 2, 3 up to the top step, so the flight is width x tread x riser x n(n+1)/2, where n is the number of steps.

How much concrete is a three-step porch?

For a 4 ft wide flight with 7 in risers and 11 in treads, the volume is 4 x 0.9167 x 0.5833 x 6 = 12.8333 cubic feet, which is 0.4753 cubic yards and about 22 bags of 80 lb mix. Add a landing separately.

Should the landing be counted with the steps?

Yes, because it is poured with the flight, but it is a separate volume. A landing is its depth times its width times the height of the whole flight, which can be a large part of the concrete, so the calculator reports it as its own figure.

What riser and tread should a concrete stair have?

A common residential proportion is a 7 inch riser and an 11 inch tread, but the code range depends on your jurisdiction and the building, so this page does not state one. It measures the concrete for whatever riser and tread you enter.

Does the waste allowance apply to the steps and the landing?

Yes, once, to the summed volume. The calculator adds the flight and the landing and then applies the waste percentage to the total, because the concrete is ordered as one pour rather than as separate steps.

Put this calculator on your site

Embed this calculator

Copy the snippet into any page. The widget is free, needs no key and sends nothing until a visitor interacts with it.

Open widget view

Sources

Every figure on this site that is not arithmetic comes from one of these pages, read while this build was made on 2026-11-25. They are Quikrete product data sheets and product pages, quoted for the bag yields, the mortar coverage and the mix ratio. Prices, core volumes and cement bag volumes are labelled editable inputs, not quoted figures.