A 10 ft x 8 ft wall, one door
74 blocks
7 bags of mortar for 59 ft² of wall.
The preset: 80 ft² less a 3 x 7 opening is 59 ft² net. At 1.125 blocks per square foot, and 10 percent waste, that is 74 blocks and 7 bags of mortar.
Concrete arithmetic · volume, bags and cost
Enter the wall length and height, choose the block, and subtract any openings. The calculator returns the number of blocks, the bags of mortar, and the grout for a solid or partially filled core.
Every figure below is produced by the same engine that runs in the browser, at build time — so an example cannot drift from the calculator above.
74 blocks
7 bags of mortar for 59 ft² of wall.
The preset: 80 ft² less a 3 x 7 opening is 59 ft² net. At 1.125 blocks per square foot, and 10 percent waste, that is 74 blocks and 7 bags of mortar.
396 blocks
34 bags of mortar for 320 ft² of wall.
A long blank wall is pure area: 40 x 8 is 320 ft², which is 360 blocks with no waste, or 396 with the 10 percent allowance. Mortar follows the block count at 13 blocks a bag.
159 blocks
14 bags of mortar for 128 ft² of wall. Grout 47.7 ft³ (1.7667 yd³).
Two 4 x 4 windows remove 32 ft² from 160. With the cores filled, the grout volume is the block count times the per-block core volume, which is an editable assumption on this page.
A concrete block wall is bought as three separate things: the blocks, the mortar that binds them, and the grout that fills the cores where the wall is reinforced. A block calculator that answers only the first is half a calculator, because mortar and grout are priced and ordered separately and a shortage of either stops the wall at the same height as a shortage of blocks.
This page works all three from one wall. The length and height give the face area, any openings are subtracted, and the net area is multiplied by the number of blocks that fit in a square foot. That block count then drives the mortar, through the manufacturer figure that one 80 lb bag of Mason Mix lays up to 13 standard blocks, and it drives the grout where the cores are filled.
The result is a material list rather than a single number, because the three items are bought from three piles and a wall is laid in one session. It does not design the wall: whether a wall needs reinforcement, how deep the footing must be, and whether a block size is permitted are questions for the local code and a designer, and this page does not answer them.
The number of blocks in a square foot comes from the nominal face of the block, not its actual size. A standard concrete masonry unit is called an 8 by 8 by 16 inch block, but the block itself is a little under 16 inches long so that a 3/8 inch mortar joint brings the module back to a full 16 inches. The nominal face of 8 by 16 inches is what tiles a wall, and it is 128 square inches, or 0.8889 square feet, which is 1.125 blocks per square foot.
That is why the thickness of the block does not change the count. An 8 by 8 by 16 block and a 6 by 8 by 16 block have the same 8 by 16 face, so a square foot of wall takes the same 1.125 of either; only the wall thickness and the core volume change. The 12 inch block is the same story again, a thicker block on the same face module.
Rounding up at the end is not optional. A wall that needs 99 blocks is bought as 99 blocks, and the waste allowance on top covers the cuts at corners and the occasional breakage. Laying out the first course before ordering is the reliable way to settle the count, and the number here is the estimate to lay it out against.
Mortar is the thin layer that levels and bonds the blocks, and its quantity tracks the block count closely enough that a single ratio is useful. The Quikrete Mason Mix data sheet states that one 80 lb bag lays up to 13 standard blocks, so the mortar estimate is the block count divided by 13 and rounded up. A bag of mortar is cheap next to a stoppage, so the estimate rounds up with the blocks.
Grout is the coarser, more fluid mix poured into block cores to bond them to reinforcement and to carry load. Not every core is filled: a wall may be solid-grouted at a corner and open elsewhere, or grouted in every other core along a reinforced run. The volume depends on the block size and how many cores are filled, which is why this page treats the per-block core volume as an editable number rather than a fixed one.
The honest summary is that the block count is arithmetic and the grout is a design decision. The count comes from the wall area and the module and is as reliable as the dimensions entered. The grout comes from how much of the wall is reinforced, which a drawing or an engineer decides, and this page only multiplies whatever core volume you give it.
A standard 8 by 8 by 16 inch block has a nominal face of 8 by 16 inches including the mortar joint, which is 0.8889 square feet, so a square foot of wall takes 1.125 blocks. The block thickness does not change the count, only the core volume.
The Quikrete Mason Mix data sheet states that one 80 lb bag lays up to 13 standard 8 by 8 by 16 inch blocks. The mortar estimate on this page divides the block count by 13 and rounds up, with the waste allowance included.
Measure the opening and enter its width and height, and the calculator subtracts the area from the wall before counting blocks. A 3 by 7 ft door removes 21 square feet, which is about 24 blocks at 1.125 blocks per square foot.
It depends on how many cores are filled and the block size, so this page treats the per-block core volume as an editable number rather than a fixed one. Multiply the block count by the core volume and by the fraction of cores filled to get the grout volume in cubic feet, then divide by 27 for cubic yards.
Use them as the estimate to check against a layout, not as a substitute for one. Lay out the first course to settle the count at corners and openings, confirm the block size with the supplier, and treat the mortar and grout figures as starting points that a mason will adjust.
Every figure on this site that is not arithmetic comes from one of these pages, read while this build was made on 2026-11-25. They are Quikrete product data sheets and product pages, quoted for the bag yields, the mortar coverage and the mix ratio. Prices, core volumes and cement bag volumes are labelled editable inputs, not quoted figures.